在允许速度不大于120km/h的正线、到发线上垫入或撤出冻害垫板,其顺坡长度不应小于冻起高度的()。
A.200倍
B.350倍
C.500倍
D.600倍
参考答案:D
In low-speed network, it is usually adequate to wait for congestion to occur and then react to it by telling the source of packets to slow down. In high-speed networks, this approach often works poorly, because in the (64) between sending the notification and notification arriving at the source, thousands of additional (65) may arrive. In ATM network , a major tool for pre- venting (66) is (67) control. When a host wants a new virtual (68) , it must describe the traffic to be offered and the service expected.
68()
A.path
B.rout
C.circuit
D.way
患者,近日洗头后渐出现头痛如裹,肢体困重,纳呆胸闷,小便不利,大便溏泻,苔白腻,脉濡。治则为
A.疏散风寒B.疏风清热C.祛风胜湿D.化痰降逆E.以上都不是