问题 单项选择题

以下有关项目经理的能力说法正确的是( )。

A.对大部分事情,项目经理在决策前应请示上级决策者

B.项目经理是整个团队的负责人,要独立地领导团队完成项目任务

C.项目经理必须是技术权威

D.项目经理的管理主要限于项目内部,因此对社交谈判能力没有要求

答案

参考答案:B

阅读理解

A farmer had a cow. He took very good care of this cow and one day when it was ill. He was very worried. He telephoned the vet (兽医).

“What’s the problem?” The vet asked him when he arrived.

“My cow is ill.” the farmer said. “I don’t know what’s the matter with her. She’s lying down and won’t eat. She’s making a strange noise.”

The vet looked over the cow. “She’s certainly ill, ” he said, “and she needs to take some very strong medicine.”

He took a bottle out of his box, put two pills into his hand and said, “The pills should make her better.”

“How should I give them to her?” the farmer asked.

The vet gave him a tube (管子) and said,“Put this tube in her mouth, then put the pills in the tube and blow. That’ll make it.”

The next day the vet came to the farm again. The farmer was sitting outside his house and looked more worried.

“How’s your cow?” the vet asked.

“No change,” the farmer said. “and I’m feeling very strange myself.”

“Oh?” the vet said. “Why?”

“I did what you said,” the farmer answered. “I put the tube in the cow’s mouth and then put two pills down it.”

“And?” the vet asked.

“The cow blew first.” the farmer said.

小题1:The farmer asked the vet for help when his cow ________.

A.couldn’t make any noise

B.didn’t eat the pills

C.was ill

D.couldn’t lie down小题2:The vet taught the farmer how ________.

A.to blow the tube

B.to make the cow take the pills

C.to take the medicine

D.to put the tube in his mouth小题3:Which of the following is true?

A.The farmer ate the pills himself.

B.The cow got better after taking the medicine.

C.The vet came to help farmer change the cow the next day.

D.The farmer waited for the vet outside his house the next day.

名词解释