问题 单项选择题

下面不属于难免流产的典型症状的是( )

A. * * 流血增多(似月经量或多于月经量)

B.停经史和早孕反应

C.突感一侧下腹撕裂样剧痛

D. * * 流液

E.见胚胎组织堵塞于宫颈口

答案

参考答案:C

阅读理解

Westerners think that the education ways in many Chinese families are hard to understand. Here are some examples.

Many children in China are looked after by their grandfathers and grandmothers because their parents are busy. But children need to stay and communicate with their parents.

Parents pay no attention to the rights (权利) of children. Parents should knock at the door before they go into the room of their children. (1)They shouldn’t move their children’s things before they agree. Parents should communicate with children and respect (尊重) the rights and decisions of them. Children who are not respected also do not know how to respect others.

(2) Parents often          their children          others. Most Chinese parents want their children to be successful, because it can save the parents’ face. Parents often say “You see somebody else is studying hard, what good grades they have, and what prizes they get”. This is the worst thing. It will only bring the child much harm and pain.

Many children are made to do what their parents expect, though they do not like it. For example, parents ask their children to learn to play the piano or go abroad. It should be decided by children themselves.

The more hard-working, the better. Many parents think school performance is everything. In fact, the integrated(综合)ability is so important that it will affect children all their lives.

小题1:将(1)句译成中文。

小题2:在(2)句的空白处分别填入一个适当的词使句意完整、上下文通顺。

小题3:回答问题:Why are many children looked after by their grandparents in China?

小题4:在文中找出与Children themselves should make a decision about it.意思相近的句子,并将它写在答题卡上。

小题5:在文中找出最能表达该短文主题的句子,并将它写在答题卡上。

问答题

二、某工程,建设单位委托具有相应资质的监理单位承担施工招标代理和施工阶段监理任务,拟通过公开招标方式分别选择建安工程施工、装修工程设计和装修工程施工单位。   在工程实施过程中,发生如下事件:   事件1:监理单位编制建安工程施工招标文件时,建设单位提出投标人资格必须满足以下要求:   (1)获得过国家级工程质量奖项;   (2)在项目所在地行政辖区内进行了工商注册登记;   (3)拥有国有股份;   (4)取得安全生产许可证。   事件2:建安工程施工单位与建设单位按《建设工程施工合同(示范文本)》签订合同后,在施工中突遇合同中约定属不可抗力的事件,造成经济损失(见表2-1)和工地全面停工15天。由于合同双方均未投保,建安工程施工单位在合同约定的有效期内,向项目监理机构提出了费用补偿和工程延期申请。

 事件3:施工过程中,总监理工程师发现施工单位刚开始采用的一项新工艺,未向项目监理机构报审。   事件4:在施工时,装修工程施工单位发现图纸错误,导致装修工程局部无法正常进行,虽然不会影响总工期,但造成了工人窝工等损失。装修工程施工单位向项目监理、单位向项目监理机构提出变更设计和费用索赔的申请。   问题:

逐条指出事件1中监理单位是否应采纳建设单位提出的要求,分别说明理由。