问题 句型转换

句型转换。

1. Tom doesn't mind talk shows.(对画线部分提问)

                                                            

2. He loves soap operas very much.(改为一般疑问句,并作肯定回答)

                                                            

3. Jack went to bed early last night.(改为否定句)

                                                            

4. Rick's mother doesn't love sitcoms.(改为肯定句)

                                                            

5. The coolest thing was the belt.(对画线部分提问)

 _____________________________                                                           

答案

1.What does Tom think of talk shows?(答案不唯一)

2. Does he love soap operas very much? Yes, he does.

3. Jack didn't go to bed early last night.

4. Rick's mother loves sitcoms.

5. What was the coolest thing?(答案不唯一)

单项选择题
单项选择题


(每小题只有一个正确答案,请从每小题的备选答案中选出一个你认为正确的答案, 涉及计算的,如有小数,保留两位小数,两位小数后四舍五入)

甲公司自行建造某项生产用大型流水线,该流水线由A、B、C、D四个设备组成。该流水线各组成部分以独立的方式为企业提供经济利益。有关资料如下:
(1)2008年1月10日开始建造,建造过程中发生外购设备和材料成本4 000万元,职工薪酬720万元,资本化的借款费用1 100万元,安装费用1 200万元,为达到正常运转发生测试费100万元,外聘专业人员服务费400万元,在建工程中使用固定资产计提折旧4万元,员工培训费6万元。2007年9月,该流水线达到预定可使用状态并投入使用。
(2)该流水线整体预计使用年限为15年,预计净残值为零,采用年限平均法计提折旧。A、B、C、D各设备在达到预定可使用状态时的公允价值分别为2 016万元、1 728万元、2 880万元和1 296万元,各设备的预计使用年限分别为10年、15年、20年和12年。按照税法规定该流水线采用年限平均法按10年计提折旧,预计净残值为零,其初始计税基础与会计计量相同。
(3)甲公司预计该流水线每年停工维修时间为7天,维修费用不符合固定资产确认条件。
(4)因技术进步等原因,甲公司于2011年3月对该流水线进行更新改造,以新的部分零部件代替了C设备的部分旧零部件,C设备的部分旧零部件的原值为1 641.6万元,更新改造时发生的支出2 000万元,2011年6月达到预定可使用状态。
要求:根据上述材料,不考虑其他因素,回答以下问题。

甲公司就该C设备更新后的账面价值为( )万元。

A.2 902.88

B.4 736

C.2 736

D.2 257.2