在过渡期满后,大、中型工程项目施工的项目经理()由取得建造师注册证书的人员担任。
A.可以
B.必须
C.不能
D.不一定
参考答案:B
简述非意识过程、潜意识过程和无意识过程。
System analysis is traditionally done top-down using structured analysis based on (1). Object-oriented analysis focuses on creation ofmodels. The three types of the analysis model are (2). There are two substages of object-oriented analysis. (3) focuses on real-world things whose semantics the application captures. The object constructed in the requirement analysis shows the (4) of the real-world system and organizes it into workable pieces. (5) addresses the computer aspects of the application that are visible to users. The objects are those which can be expected to vary from time to time quite rapidly.
空白(3)处应选择()
A.Static analysis
B.Semantic analysis
C.Scope analysis
D.Domain analysis