编制按( )分解的资金使用计划,通常可利用控制项目进度的网络图进一步扩充而得。
A.子项目
B.时间进度
C.投资构成
D.形象进度
参考答案:B
利培酮的不良反应是()
A.脂蛋白异常
B.糖尿病
C.高催乳素血症
D.剂量依赖性的EPS
E.在老年痴呆患者中可出现脑血管事件,包括中风、短暂性胸痛等
Developing reliable software on time and within (66) represents a difficult endeavor for many organizations.
Usually business solutions have three main aspects: people, (67) ,and technology. The main reason for failing software projects has little to do with technology and tools, and much to do with lack of process (68) . Experience has shown that introducing new technology and tools in an immature or undisciplined environment is likely to increase the chaos. CASE tools are not enough. "A fool with a tool is still a fool !"
Structured method was the first wave of the software industry. This was the beginning of transforming software development from a" (69) industry" to mass production. Software process movement if the second wave in the software industry. The process maturity movement prepares the way for the third wave of the software industry :"software industrialization". Software development will become like an assembly and manufacturing process. A cfiticalenabling factor is adisciplined software engineering . process with predictable quality, (70) and functionality.
(68)处填()。
A.law
B.discipline
C.plan
D.evaluation