问题 单项选择题

When I was six, Dad brought home a dog one day, who was called “Brownie”. My brothers and I all loved Brownie and did different things with her. One of us would walk her, another would feed her, then there were baths, playing catch and many other games. Brownie, in return, loved each and every one of us. One thing that most touched my heart was that she would go to whoever was sick and just be with them. We always felt better when she was around.

One day, as I was getting her food, she chewed up(咬破) one of Dad’s shoes, which had to be thrown away in the end. I knew Dad would be mad and I had to let her know what she did was wrong. When I looked at her and said, “Bad girl,” she looked down at the ground and then went and hid. I saw a tear in her eyes.

Brownie turned out to be more than just our family pet. She went everywhere with us. People would stop and ask if they could pet her. Of course she’d let anyone pet her. She was just the most lovable dog. There were many times when we’d be out walking and a small child would come over and pull on her hair. She never barked (咬) or tried to get away. Funny thing is she would smile. This frightened people because they thought she was showing her teeth. Far from the truth, she loved everyone.

Now many years have passed since Brownie died of old age. I still miss the days when she was with us.

Some people got frightened by Brownie when she()

A.smiled

B.barked

C.rushed to them

D.tried to be funny

答案

参考答案:A

解析:

由倒数第二段倒数第二句和第三句可知,当Brownie笑的时候,人们看到她害怕是因为人们以为她在龇牙咧嘴。

问答题 案例分析题

某工程,建设单位和施工单位按《建设工程施工合同(示范文本)》签订了施工合同,在施工合同履行过程中发生如下事件:事件1:工程开工前,总监理工程师主持召开了第一次工地会议。会上,总监理工程师宣布了建设单位对其的授权,并对召开工地例会提出了要求。会后,项目监理机构起草了会议纪要,由总监理工程师签字后分发给有关单位;总监理工程师主持编制了监理规划,报送建设单位。事件2:施工过程中,由于施工单位遗失工程某部位设计图纸,施工人员凭经验施工,现场监理员发现时,该部位的施工已经完毕。监理员报告了总监理工程师,总监理工程师到现场后,指令施工单位暂停施工,并报告建设单位。建设单位要求设计单位对该部位结构进行核算。经设计单位核算,该部位结构能够满足安全和使用功能的要求,设计单位电话告知建设单位,可以不作处理。事件3:由于事件2的发生,项目监理机构认为施工单位未按图施工,该部位工程不予计量;施工单位认为停工造成了工期拖延,向项目监理机构提出了工程延期申请。事件4:主体结构施工时,由于发生不可抗力事件,造成施工现场用于工程的材料损坏,导致经济损失和工期拖延,施工单位按程序提出了工期和费用索赔。事件5:施工单位为了确保安装质量,在施工组织设计原定检测计划的基础上,又委托一家检测单位加强安装过程的检测。安装工程结束时,施工单位要求项目监理机构支付其增加的检测费用,但被总监理工程师拒绝。

事件5中总监理工程师的做法是否正确?为什么?