问题 填空题
补全对话 从每题A、B、C、D中, 选出一个能够填入对话空白处的最佳选项。
A: Hey, John.
B: Hi, Michael.
A:    1   
B: I’m reading a book.
A:     2    I have got the latest movie video. Let’s watch it together.
B: Great. Where is your house?
A:    3   . There is a small bookstore at the crossing. I’ll meet you there.
B: Oh, OK.   4   
A: What about 2 pm?
B: OK. By the way, I haven’t finished my homework yet and I have some problems with it.
A:    5    We can do it together then.
小题1:
A.How is the weather?B.How are you?
C.What are you doing?D.How’s it going?
小题2:
A.Do you want to come over to my house?
B.This book is boring.
C.Can you help me fix my TV?
D.I like to watch TV.
小题3:
A.He is eating at home.
B.It’s on Bridge Street.
C.It’s on the table.
D.Let’s play table tennis.
小题4:
A.When shall we meet?
B.How can I get there?
C.What time is it?
D.How far is it from my house?
小题5:
A.So have IB.Neither I do
C.So I doD.Neither have I.
答案

小题1:C

小题2:A

小题3:B

小题4:A

小题5:D

小题1:细节理解题,根据答语可知。询问的是您在干什么。

小题2:细节理解题,根据语句Where is your house?可知。

小题3:细节理解题,根据问句Where is your house?可知,要回答家的具体的位置。

小题4:细节理解题,根据语句What about 2 pm可知,应该是询问时间。

小题5:细节理解题,根据语句We can do it together then.理解可知,A也有问题。

填空题
问答题

阅读下列说明,回答问题。
[说明]
企业甲就信息化网络工程项目与承建单位乙、监理单位丙分别签订了建设合同、监理合同。承建单位乙在得到甲同意的情况下,将机房工程分包给单位丁,并签订了分包合同。在项目实施过程中发生了以下几个事件:
事件1:在机房建设过程中,分包单位丁的施工人员为了赶工期,把信号线PVC管和电源线PVC管同放在一条泡沫条的槽中,造成质量隐患,专业监理工程师向总监理工程师及时汇报了情况。总监理工程师立即向承建单位乙和分包单位丁签发了整改通知。承建单位乙称机房工程已根据合同由分包单位丁实施,现在机房工程出现问题,应由分包单位丁承担一切责任。
事件2:在布线过程中,承建单位乙的施工人员违反规范要求,贪图一时方便,线缆不够长,接一段了事,旁站监理工程师及时发现并报告给总监理工程师。如果继续施工,线缆将被隐蔽。所以总监理工程师立即向承建单位乙签发了“停工令”。
事件3:在网络工程的实施过程中,由于某些设备的到货延迟使整个工期受到影响,承建单位乙向监理提交了进度变更申请。

在事件1中:
发现机房工程存在质量隐患,承建单位乙称应由分包单位丁承担一切责任,这种态度为什么不对
总监理工程师向承建单位乙和分包单位丁签发整改通知,有什么不妥之处吗为什么